Above Ground Pools
Take-down and haul-away of tired above ground pools and their frames, clearing the space back to usable yard.
Learn more →Most Peel pools going out now went in between the 1980s and the 2000s. Thirty-odd years on, the choice is spend big on a resurface — or get the yard back.
Mandurah put pools in faster than almost anywhere in WA — the canal estates, the Halls Head subdivisions, the brick-and-tile streets of Dudley Park and Coodanup. A big share of those pools are now 25 to 40 years old, and the sums have flipped: a resurfacing, new equipment and a compliant fence upgrade can cost more than removing the pool altogether. Removal is quoted fixed and in writing; typical figures are on the What It Costs page.
Two local factors make Peel inground removals their own kind of job:
Full removal — the whole shell comes out: concrete broken up and carted off, fibreglass cut up and removed, hole backfilled with clean fill and compacted in layers. Costs more, but the ground is genuinely reinstated and there's nothing buried for a future buyer to find.
Partial removal (backfill) — the walls are broken down, drainage holes are punched through the floor, the top metre or so of shell is removed and the rest is buried under compacted fill. Cheaper and faster, but the site should be disclosed on sale and isn't automatically buildable.
If in doubt, we'll tell you which one your plans actually need before you commit to either. Small shells — spas and plunge pools — are usually full-removal jobs by default; they're covered on their own page.
Included in the written quote:
Not included:
What moves the price:
Removing an inground pool is demolition work, so it generally needs a demolition permit — form BA5 under the Building Act 2011 (WA) — lodged with the City of Mandurah or, around Pinjarra and the Murray side of the region, the Shire of Murray (whose demolition permit fee started at $110 for a house-class structure in 2025–26 — fees are indexed, so confirm the current figure when you lodge). The safety barrier stays legally required until the shell can no longer hold 300 mm of water, and once the pool is gone the council is notified in writing — with before and after photos — so it comes off the four-yearly barrier inspection register and the fee comes off your rates. The full sequence, form by form, is on the Approvals page.
We ask the contractors we work with to hold the relevant WorkSafe WA licences and public liability cover — ask to see both before the machine arrives.
Call (08) 9516 1339 with the pool type, rough size and what's between the street and the water, and you'll get a straight answer on how it would run.
Take-down and haul-away of tired above ground pools and their frames, clearing the space back to usable yard.
Learn more →Removal of old spas and small plunge pools that have stopped earning their keep, with the site left tidy and level.
Learn more →Pulling out cracked pool paving, coping and old safety fencing alongside the pool itself, so nothing half-finished gets left behind.
Learn more →Stripping old kitchens and bathrooms back to the frame ahead of a renovation, including fixtures, tiling and cabinetry.
Learn more →No — leave the water in it and say so when you call. In Mandurah's sandy, high-water-table ground, an emptied fibreglass shell can 'pop' — lift out of the ground under groundwater pressure — or crack as the surrounding sand moves. Dewatering is part of the removal job and gets sequenced so the shell is only empty once it's about to be cut up or lifted out.
It stays up. WA's Building Regulations 2012 require a compliant barrier around anything that can hold more than 300 mm of water, and that applies right up until the shell can no longer hold water. The fence comes down as one of the last steps of the job, and if it's the glass or tubular aluminium type it can often be set aside for resale rather than scrapped.
Over a fully removed, properly backfilled and compacted hole — generally yes, and the compaction certificate the City of Mandurah asks for on below-ground pool removals is the document a future builder or buyer will want to see. Over a partial removal, where the floor of the shell stays in the ground, treat the area as garden and lawn unless an engineer says otherwise. If building is the plan, say so at quote stage so the job is specified for it.